黄金城网站登录首页-黄金城最新娱乐网站

中文/EN
Alternate Text
  • Alternate Text

    Qingdao Olympic Sailing Center

    Qingdao Olympic Sailing Center is locatedin Qingdao Fushan bay, serving as the sailing competition base for the 29thBeijing Olympic Games and 13th Paralympic Games. The whole project covers 45hectares, and has been divided into two parts, land engineering and waterengineering. The land part consist of five building blocks: Administrationand Competition Management center, Athlete’s Apartment, Athlete Center, MediaCenter, Logistics Support and Function Center, as well as environmentalfacilities and other supporting projects. The water part consist of mainbreakwater, sub-breakwater, measurement hall pier, Olympic Memorial Wall Pier, revetment,Sailing boat launching ramp, awards platform and other marine structures.

    Detail

  • Alternate Text

    Project for Shandong Hi-Speed Group in middle port area, Weifang port

    Berth #18-#20 of Shandong Hi-Speed Group inthe east operation zone, middle port area of Weifang port include two 50000DWTgeneral berths and two 20000DWT Ro-Ro berths. CIIO has carried out thefeasibility study, preliminary design and construction drawing design of thisproject. The project takes overall consideration of the function requirementsto handle different cargo types such as Ro-Ro passenger, Ro-Ro cargo, Ro-Rovehicle, drop and pull transport and container,,as well as current and futuredevelopment demand, which make it an innovative and technically leadingproject. Meanwhile it grasps the opportunity that the container berth of theplanning west operation zone has not been constructed yet, to arrange acasisson launching and shipping terminal here, solving the problem of thelacking of caisson precast yard. The project lays great significance as amilestone in the development of Weifang port.

    Detail

  • Alternate Text

    Pizhou Operating Area in Xuzhou Port

    The new terminal project for Pizhouoperating area relocation in Xuzhou Port is one of the PPP demonstrationprojects in Jiangsu Province. The phase I of the project covers three bulkberths, four coal berths and one general berth; and the phase II includes threebreak-bulk berths and two multi-purpose berths, respectively awarded to ourcompany in PPP and EPC contract.


    Detail

  • Alternate Text

    Expansion project of Queen Elizabeth II Quay, Freetown Port, Republic of Sierra Leone

    To meet the rapid development demand of theforeign trade and to make Freetown port the transshipment port of West Africa,the government of Sierra Leone has decided to make an expansion of the QE IIquay in Freetown port. CIIO has undertaken the design and construction of thisproject. The project includes three new 50000DWT deep water container berthsand one 50000DWT Ro-Ro berth. The berth length is 1280m and the fromed landarea is 360000m2. The project is equipped with two 41t quayside containercranes, 6 mulyi-purpose portal cranes and three 25t portal cranes.                                                              

    Detail

  • Alternate Text

    Nickel ore specialized terminal project, Sulawesi, Indonesia

    Jiangsu Virtue Dragon Nickel Industry Co.,Ltd. nickel ore specialized terminal (1st phase) is located in the north coastof Kendari, Sulawesi, Indonesia. The project consists of two 5000DWT bargeberths and one 20000DWT general cargo berth, among which the marine structureof the 20000DWT general cargo berth is designed as 50000DWT and is able toaccommodate 50000DWT ships as planned in the future development. CIIOundertakes EPC of the project.                                                                                

    Detail

  • Alternate Text

    Fujian Dongshan army slideway

    This project is divided into two phases.The first phase includes the construction of four 1,000DWT shipbuilding berthsto the north of the built breakwater and in the southern section of the revetment(Mainly for repairing the vessel types designated by the construction companyand 1,000DWT ships); the second phase includes one 20,000DWT shipbuilding berth32m away from No. 1-4 shipbuilding berths (Not constructed in this phase). Thefour 1,000DWT berths are connected into one, with the top elevation of 5.40mand end elevation of 1.50m, horizontal projection length of 146m, and totalwidth of 110m. The top elevation of the 20,000DWT berth is 6.27 m, and the endelevation is 2.00 m; the horizontal projection length is 226 m, and the widthis 32 m.


    Detail

  • Alternate Text

    Wharf project of Xiaomangniu operation zone, Yancheng port

    The 3rd stage wharf project of Xiaomangniuoperation zone, Xiangshui port area, Yancheng port is a"financing+EPC" project, which fully displays CIIO's ability inproject financing and equipment manufacturing. The project is located in thesouth bank of Guanhe River, Xiangshui, Yancheng. Construction content includes four50000DWT berths. The berth length is 900m and the design throughput capacity is8000000 t. Width of the wharf platform is 30m and the structure of beams andslabs on standing piles is used.

    Detail

  • Alternate Text

    Weihai Shipyard Arc Slipway

    The Weihai Shipyard Arc Slipway Project isa part of the technological transformation project in Weihai Shipyard. Theproject includes the construction of the shipbuilding berth, frame area andother ancillary works. The engineering design of arc slipway has successfullysolved the problem of docking and launching of large ships in longitudinalslipway. Its structural design can ensure that the curvature radius at eachpoint of the slipway is constant, and meet the load requirements of docking.This project won the first prize of the excellent design issued by ShandongProvincial Department of Transportation, and has been taken as an example inuniversity textbook.



    Detail

  • Alternate Text

    Fujian Zhangpu Liuao Heavy Cargo Terminal Project

    Fujian Zhangpu Liuao Heavy Cargo TerminalProject is located in the sea area southeast of Liuao Peninsula, ZhangpuCounty, Zhangzhou City, Fujian Province, involving the transformation of theexisting 1,000DWT berth (1 #) and the construction of a new 5,000DWT heavycargo berth (2#). The new berth is 150m in length, composed of the east berthingplatform (150m long and 19m wide), west gantry crane track (gauge: 90m; ratedlifting capacity: 1,000t) platform (150m long and 19m wide) and the 780m longnew revetment, of which the inner revetment is 73m long, the east revetment is376m long, the west revetment is 60m long, and the northwest revetment is 271 mlong. The total area of the port area is 110,854m2, including the 31,872m2 rearstorage yard. One fan part storage area is located on the southeast side andnorthwest side of the storage yard, of which the southeast storage area is 53,609m2and the northwest storage area is 16,887m2. The road in the port is 683m long.

    The project is another EPC project awardedto our company, highlighting our comprehensive competitiveness in integratedwater transport project solutions.



    Detail

MORE
  • Alternate Text

    Location:Building 2, NO.176 Haier Road

  • Alternate Text

    Telephone:0532-85909188

  • Alternate Text

    Fax:0532-85909189

OA
Alternate Text Alternate Text

Copyright © 2016 China Integrity International Oceaneering Co. Ltd All rights reserved design dongbaqu