黄金城网站登录首页-黄金城最新娱乐网站

中文/EN
Alternate Text

Wharf project of Xiaomangniu operation zone, Yancheng port

The 3rd stage wharf project of Xiaomangniuoperation zone, Xiangshui port area, Yancheng port is a"financing+EPC" project, which fully displays CIIO's ability inproject financing and equipment manufacturing. The project is located in thesouth bank of Guanhe River, Xiangshui, Yancheng. Construction content includes four50000DWT berths. The berth length is 900m and the design throughput capacity is8000000 t. Width of the wharf platform is 30m and the structure of beams andslabs on standing piles is used.

  • Alternate Text

    Location:Building 2, NO.176 Haier Road

  • Alternate Text

    Telephone:0532-85909188

  • Alternate Text

    Fax:0532-85909189

OA
Alternate Text Alternate Text

Copyright © 2016 China Integrity International Oceaneering Co. Ltd All rights reserved design dongbaqu